The Channel Tunnel (French: Tunnel sous la Manche), sometimes referred to as the Chunnel, is a 50.46-kilometre (31.35-mile) railway tunnel beneath the English Channel which connects Folkestone in the United Kingdom with Coquelles in northern France. Opened in 1994, it remains the only fixed link between Great Britain and the European mainland.
The tunnel has the longest underwater section of any tunnel in the world, at 37.9 km (23.5 miles), reaching a depth of 75 m (246 ft) below sea level and runs, on average, 45 m (148 ft) below the seabed. It is the third-longest railway tunnel in the world. Although the tunnel was designed for speeds up to 200 km/h (120 mph), trains are limited to a maximum speed of 160 km/h (99 mph) for safety reasons. It connects to high-speed railway lines on either end: the LGV Nord in France and High Speed 1 in the United Kingdom.
The tunnel is operated by Getlink (formerly Eurotunnel) and is used by Eurostar high-speed passenger trains, LeShuttle services for road vehicles, and freight trains. In 2017, Eurostar trains carried 10.3 million passengers, freight trains transported 1.2 million tonnes (2.6 billion pounds) of freight, and LeShuttle trains moved 10.4 million passengers in 2.6 million cars and 51,000 coaches, and 1.6 million heavy goods vehicles carrying 21.3 million tonnes (47 billion pounds) of freight. That compares with 11.7 million passengers, 2.2 million cars, and 2.6 million heavy goods vehicles transported by sea through the Port of Dover.
Proposals for a cross-Channel tunnel date back as early as 1802, but concerns over national security delayed development. The modern project was initiated by Eurotunnel in 1988 and completed in 1994, at a final cost of £4.65 billion (equivalent to £9.8 billion in 2025). An engineering marvel, the Channel Tunnel was, at the time of its opening, by far the longest tunnel in Europe, and has only been surpassed by the Gotthard Base Tunnel in Switzerland. However, despite its engineering significance, several economic assessments have found that it has had only a limited positive economic impact on the British economy. Additionally, the tunnel has also experienced occasional service disruptions due to technical faults, fires, severe weather, and unauthorised access by migrants around Calais seeking entry to the United Kingdom.
Contents
History
Earlier proposals
In 1802, Albert Mathieu-Favier, a French mining engineer, proposed a tunnel under the English Channel, with illumination from oil lamps, horse-drawn coaches, and an artificial island positioned mid-Channel for changing horses. His design illustrated a bored two-level tunnel, with the upper tunnel to be used for transport, while the lower tunnel for groundwater flows.
In 1839, Aimé Thomé de Gamond, a Frenchman, performed the first geological and hydrographical surveys on the Channel between Calais and Dover. He explored several schemes and, in 1856, presented a proposal to Napoleon III for a mined railway tunnel from Cap Gris-Nez to East Wear Point with a port/airshaft on the Varne sandbank at a cost of 170 million francs, or less than £7 million.
In 1865, a deputation led by George Ward Hunt proposed the idea of a tunnel to the Chancellor of the Exchequer of the day, William Ewart Gladstone.
In 1866, Henry Marc Brunel surveyed the sea floor of the Strait of Dover. The results of his survey proved that the sea floor was composed of chalk, like the adjoining cliffs; therefore, the construction of a tunnel would be technically feasible. For this survey, he invented the gravity corer, which is still used in geology.
Around 1866, William Low and Sir John Hawkshaw promoted tunnel ideas, but apart from preliminary geological studies, none were implemented.
An official Anglo-French protocol was established in 1876 for the construction of a cross-Channel railway tunnel.
In 1881, British railway entrepreneur Sir Edward Watkin and Alexandre Lavalley, a contractor of the French Suez Canal Company, participated in the Anglo-French Submarine Railway Company, which conducted exploratory work on both sides of the Channel. From June 1882 to March 1883, the British tunnel boring machine tunnelled, through chalk, a total of 1,840 metres (6,037 ft), while Lavalley used a similar machine to drill 1,669 m (5,476 ft) from Sangatte on the French side. However, the cross-Channel tunnel project was abandoned in 1883, despite this success, after fears raised by the British military that an underwater tunnel might be used as an invasion route. Nevertheless, in 1883, this TBM was used to bore a railway ventilation tunnel—7 ft (2.1 m) in diameter and 6,750 ft (2,060 m) long—between Birkenhead and Liverpool, England, through sandstone under the River Mersey. These early works were encountered more than a century later during the TransManche Link (TML) project.
Initiation of the project
In 1979, the "Mouse-hole Project" was suggested when the Conservatives came to power in Britain. The concept was a single-track rail tunnel with a service tunnel but without shuttle terminals. Even though the British government showed no interest in funding the project, British Prime Minister Margaret Thatcher did not object to a privately funded project; however, she assumed it would be for cars rather than trains. In 1981, Thatcher and French president François Mitterrand agreed to establish a working group to evaluate a privately funded project. In June 1982, the Franco-British study group favoured a twin tunnel to accommodate conventional trains and a vehicle shuttle service. In April 1985, promoters were invited to submit scheme proposals. Four submissions were shortlisted:
Channel Tunnel, a rail proposal based on the 1975 scheme presented by Channel Tunnel Group/France–Manche (CTG/F–M).
Eurobridge, a 35 km (22-mile) suspension bridge with a series of 5-kilometre (3.1 mi) spans with a roadway in an enclosed tube.
Euroroute, a 21 km (13-mile) tunnel between artificial islands approached by bridges.
Channel Expressway, a set of large-diameter road tunnels with mid-Channel ventilation towers.
The cross-Channel ferry industry protested under the name "Flexilink." In 1975, there was no campaign protesting a fixed link, with one of the largest ferry operators (Sealink) being state-owned. Flexilink continued to rouse opposition throughout 1986 and 1987. Public opinion strongly favoured a drive-through tunnel, but concerns about ventilation, accident management, and driver mesmerisation resulted in the only shortlisted rail submission, CTG/F-M, being awarded the project in January 1986. Reasons given for the selection included that it caused least disruption to shipping in the Channel, alongside posing the least possible environmental disruption, was the best protected against terrorism, and was the most likely to attract sufficient private finance.
Arrangement
The British Channel Tunnel Group consisted of two banks and five construction companies, while their French counterparts, France–Manche, consisted of three banks and five construction companies. The banks' role was to advise on financing and secure loan commitments. On 2 July 1985, the groups formed Channel Tunnel Group/France–Manche (CTG/F–M). Their submission to the British and French governments was drawn from the 1975 project, along with 11 volumes and a substantial environmental impact statement.
The Anglo-French Treaty on the Channel Tunnel was signed by both governments in Canterbury Cathedral. The Treaty of Canterbury (1986) prepared the Concession for the construction and operation of the Fixed Link by privately owned companies and outlined arbitration methods to be used in the event of disputes. It established the Intergovernmental Commission (IGC), responsible for monitoring all matters associated with the Tunnel's construction and operation on behalf of the British and French governments, and a Safety Authority to advise the IGC. It drew a land frontier between the two countries in the middle of the Channel tunnel—the first of its kind.
Design and construction were done by the ten construction companies in the CTG/F-M group. The French terminal and boring from Sangatte were done by the five French construction companies in the joint venture group GIE Transmanche Construction. The English Terminal and boring from Shakespeare Cliff were done by the five British construction companies in the Translink Joint Venture. The two partnerships were linked by a bi-national project organisation, TransManche Link (TML). The Maître d'Oeuvre was a supervisory engineering body employed by Eurotunnel under the terms of the concession that monitored the project and reported to the governments and banks.
In France, with its long tradition of infrastructure investment, the project had widespread approval. The French National Assembly approved it unanimously in April 1987, and after a public inquiry, the Senate approved it unanimously in June. In Britain, select committees examined the proposal, making history by holding hearings away from Westminster, in Kent. In February 1987, the third reading of the Channel Tunnel Bill took place in the House of Commons and passed with a vote of 94 to 22. The Channel Tunnel Act gained Royal assent and passed into law in July. Parliamentary support for the project came partly from provincial members of Parliament on the basis of promises of regional Eurostar through train services that never materialised; the promises were repeated in 1996 when the contract for construction of the Channel Tunnel Rail Link was awarded.
Cost
The tunnel is a build-own-operate-transfer (BOOT) project with a concession. TML would design and build the tunnel, but financing was through a separate legal entity, Eurotunnel. Eurotunnel absorbed CTG/F-M and signed a construction contract with TML, but the British and French governments controlled final engineering and safety decisions, now managed by the Channel Tunnel Safety Authority. The British and French governments gave Eurotunnel a 55-year operating concession (from 1987; extended by 10 years to 65 years in 1993) to repay loans and pay dividends. A Railway Usage Agreement was signed between Eurotunnel, British Rail, and SNCF, guaranteeing future revenue in exchange for the railways obtaining half of the tunnel's capacity.
Private funding for such a complex infrastructure project was of unprecedented scale. Initial equity of £45 million was raised by CTG/F-M, increased by £206 million through a private institutional placement, £770 million was raised in a public share offer that included press and television advertisements, a syndicated bank loan, and a letter of credit arranged £5 billion. Privately financed, the total investment costs at 1985 prices were £2.6 billion. At the 1994 completion actual costs were, in 1985 prices, £4.65 billion: an 80% cost overrun. The cost overrun was partly due to enhanced safety, security, and environmental demands. Financing costs were 140% higher than forecast.
Construction
Working from both the English and French sides of the Channel, eleven tunnel boring machines (TBMs) cut through chalk marl to construct two rail tunnels and a service tunnel. The vehicle shuttle terminals are at Cheriton (part of Folkestone) and Coquelles, and are connected to the English M20 and French A16 motorways, respectively.
Tunnelling commenced in 1988, and the tunnel began operating in 1994. At the peak of construction, 15,000 people were employed with daily expenditure over £3 million. Ten workers, eight of them British, were killed during construction between 1987 and 1993, most in the first few months of boring.
Completion
A 50 mm (2.0 in) diameter pilot hole allowed the service tunnel to break through without ceremony on 30 October 1990. The two tunnelling efforts were misaligned by only 30 cm (12 in) horizontally and 8 cm (3.1 in) vertically, with the total length of the tunnel being 2 cm (0.79 in) shorter than estimated. On 1 December 1990, Englishman Graham Fagg and Frenchman Philippe Cozette broke through the service tunnel with the media watching. A BBC commentator called Graham Fagg "the first man to cross the Channel by land for 8000 years". A Paddington Bear soft toy was chosen by British tunnellers as the first item to pass through to their French counterparts when the two sides met. Eurotunnel completed the tunnel on time.
The tunnel was officially opened, one year later than originally planned, by the French president François Mitterrand and Queen Elizabeth II, at a ceremony in Calais on 6 May 1994. The Queen travelled through the tunnel to Calais on a Eurostar train, which stopped nose to nose with the train that carried President Mitterrand from Paris. After the ceremony, President Mitterrand and the Queen travelled on Le Shuttle to a similar ceremony in Folkestone. A full public service did not start for several months. The first freight train, however, ran on 1 June 1994 and carried Rover and Mini cars being exported to Italy.
The Channel Tunnel Rail Link (CTRL), now called High Speed 1, runs 69 miles (111 km) from St Pancras railway station in London to the tunnel portal at Folkestone in Kent. It cost £5.8 billion. On 16 September 2003, then-prime minister Tony Blair, opened the first section of High Speed 1, from Folkestone to north Kent. On 6 November 2007, the Queen officially opened High Speed 1 and St Pancras International station, replacing the original slower link to Waterloo International railway station. High Speed 1 trains travel at up to 300 km/h (186 mph), the journey from London to Paris taking 2 hours 15 minutes, to Brussels 1 hour 51 minutes.
In 1994, the American Society of Civil Engineers elected the tunnel as one of the seven modern Wonders of the World. In 1995, the American magazine Popular Mechanics published the results.
Opening dates
The opening was phased for various services offered as the Channel Tunnel Safety Authority, the IGC, gave permission for various services to begin at several dates over the period 1994/1995 but start-up dates were a few days later.
Engineering
Site investigation undertaken in the 20 years before construction confirmed earlier speculations that a tunnel could be bored through a chalk marl stratum. The chalk marl is conducive to tunnelling, with impermeability, ease of excavation and strength. The chalk marl runs along the entire length of the English side of the tunnel, but on the French side a length of 5 kilometres (3.1 mi) has variable and difficult geology. The tunnel consists of three bores: two 7.6 m (24 ft 11 in) diameter rail tunnels, 30 m (98 ft) apart, 50 kilometres (31 mi) in length with a 4.8 m (15 ft 9 in) diameter service tunnel in between. The three bores are connected by 270 cross-passages and 194 piston relief ducts.
The service tunnel was used as a pilot tunnel, boring ahead of the main tunnels to determine the conditions. English access was provided at Shakespeare Cliff and French access from a shaft at Sangatte. The French side used five tunnel boring machines (TBMs), and the English side six. The service tunnel uses Service Tunnel Transport System (STTS) and Light Service Tunnel Vehicles (LADOGS). Fire safety was a critical design issue.
Between the portals at Beussingue and Castle Hill, the tunnel is 50.5 km (31.4 mi) long, with 3.3 km (2.1 mi) under land on the French side and 9.3 km (5.8 mi) on the UK side, and 37.9 km (23.5 mi) under the sea. It is the third-longest rail tunnel in the world, behind the Gotthard Base Tunnel in Switzerland and the Seikan Tunnel in Japan, but has the longest undersea section. The average depth is 45 m (148 ft) below the seabed.
On the UK side, of the expected 5 million cubic metres (6.5 million cubic yards) of spoil, approximately 1 million cubic metres (1.3 million cubic yards) was used as fill at the terminal site. The remainder was deposited at Lower Shakespeare Cliff behind a seawall, reclaiming 74 acres (30 hectares) of land. This reclaimed land was later developed into Samphire Hoe, a country park.
An environmental assessment did not identify any major risks associated with the project, and additional studies on safety, noise, and air pollution were generally positive. However, environmental objections were raised regarding the proposed high-speed rail link to London.
Geology
Successful tunnelling required a sound understanding of topography and geology and the selection of the best rock strata through which to dig. The geology of this site generally consists of north-easterly dipping Cretaceous strata, part of the northern limb of the Wealden-Boulonnais dome. It has:
Continuous chalk in the cliffs on either side of the Channel, with no major faulting, as observed by Verstegan in 1605.
Four geological strata, marine sediments laid down 90–100 million years ago; pervious Upper and Middle Chalk above slightly pervious Lower Chalk and finally impermeable Gault Clay. There is a sandy stratum of Glauconitic marl (tortia), between the chalk marl and the gault clay.
A 25–30 m (82–98 ft) layer of chalk marl (French: craie bleue) in the lower third of the lower chalk appeared to present the best tunnelling medium. The chalk has a clay content of 30–40% making it impermeable to groundwater, yet relatively easy excavation with strength allowing minimal support. Ideally, the tunnel would be bored in the bottom 15 m (49 ft) of the chalk marl, allowing water inflow from fractures and joints to be minimised, but above the gault clay that would increase stress on the tunnel lining and swell and soften when wet.
On the English side, the stratum dip is less than 5°; on the French side, this increases to 20°. Jointing and faulting are present on both sides. On the English side, only minor faults of displacement less than 2 m (6 ft 7 in) exist; on the French side, displacements of up to 15 m (49 ft 3 in) are present owing to the Quenocs anticlinal fold. The faults are of limited width, filled with calcite, pyrite and remolded clay. The increased dip and faulting restricted the selection of routes on the French side. To avoid confusion, microfossil assemblages were used to classify the chalk marl. On the French side, particularly near the coast, the chalk was harder, more brittle and more fractured than on the English side. This led to the adoption of different tunnelling techniques on the two sides.
The Quaternary undersea valley Fosse Dangeard and Castle Hill landslip at the English portal caused concerns. Identified by the 1964–1965 geophysical survey, the Fosse Dangeard is an infilled valley system extending 80 m (262 ft) below the seabed, 500 m (1,640 ft) south of the tunnel route in mid-channel. A 1986 survey showed that a tributary crossed the path of the tunnel, and so the tunnel route was made as far north and deep as possible. The English terminal had to be located in the Castle Hill landslip, which consists of displaced and tipping blocks of lower chalk, glauconitic marl and gault debris. Thus the area was stabilised by buttressing and inserting drainage adits. The service tunnel acted as a pilot preceding the main ones, so that the geology, areas of crushed rock, and zones of high water inflow could be predicted. Exploratory probing was done in the service tunnel, in the form of extensive forward probing, vertical downward probes and sideways probing.
Site investigation
Marine soundings and samplings were made by Thomé de Gamond in 1833–67, establishing the seabed depth at a maximum of 55 m (180 ft) and the continuity of geological strata (layers). Surveying continued for many years, with 166 marine and 70 land-deep boreholes being drilled and more than 4,000 line kilometres of the marine geophysical survey completed. Surveys were undertaken in 1958–1959, 1964–1965, 1972–1974 and 1986–1988.
The surveying in 1958–1959 catered for immersed tube and bridge designs, as well as a bored tunnel, and thus a wide area was investigated. At that time, marine geophysics surveying for engineering projects was in its infancy, with poor positioning and resolution from seismic profiling. The 1964–1965 surveys concentrated on a northerly route that left the English coast at Dover harbour; using 70 boreholes, an area of deeply weathered rock with high permeability was located just south of Dover harbour.
Given the previous survey results and access constraints, a more southerly route was investigated in the 1972–1973 survey, and the route was confirmed to be feasible. Information for the tunnelling project also came from work before the 1975 cancellation. On the French side at Sangatte, a deep shaft with adits was made. On the English side at Shakespeare Cliff, the government allowed 250 m (820 ft) of 4.5 m (15 ft) diameter tunnel to be driven. The actual tunnel alignment, method of excavation and support were essentially the same as the 1975 attempt. In the 1986–1987 survey, previous findings were reinforced, and the characteristics of the gault clay and the tunnelling medium (chalk marl that made up 85% of the route) were investigated. Geophysical techniques from the oil industry were employed.
Tunnelling
Tunnelling was a major engineering challenge; the only precedent was the undersea Seikan Tunnel in Japan, which opened in 1988. A serious health and safety risk with building tunnels under water is major water inflow due to the high hydrostatic pressure from the sea above, under weak ground conditions. The tunnel also had the challenge of timescale: being privately funded, an early financial return was paramount.
The objective was to construct two 7.6 m-diameter (25 ft) rail tunnels, 30 m (98 ft) apart, 50 kilometres (31 mi) in length; a 4.8-metre-diameter (16 ft) service tunnel between the two main ones; pairs of 3.3 m (10 ft 10 in)-diameter cross-passages linking the rail tunnels to the service tunnel at 375 m (1,230 ft) spacing; piston relief ducts 2 m (6 ft 7 in) in diameter connecting the rail tunnels 250 m (820 ft) apart; two undersea crossover caverns to connect the rail tunnels, with the service tunnel always preceding the main ones by at least 1 km (0.6 mi) to ascertain the ground conditions. There was plenty of experience with excavating through chalk in the mining industry, while the undersea crossover caverns were a complex engineering problem. The French one was based on the Mount Baker Ridge freeway tunnel in Seattle; the UK cavern was dug from the service tunnel ahead of the main ones, to avoid delay.
Precast segmental linings in the main tunnel boring machine (TBM) drives were used, but two different solutions were used. On the French side, neoprene and grout sealed bolted linings made of cast iron or high-strength reinforced concrete were used; on the English side, the main requirement was for speed, so bolting of cast-iron lining segments was only done in areas of poor geology. In the UK rail tunnels, eight lining segments plus a key segment were used; in the French side, five segments plus a key. On the French side, a 55 m (180 ft) diameter 75 m (246 ft) deep grout-curtained shaft at Sangatte was used for access. On the English side, a marshalling area was 140 m (459 ft) below the top of Shakespeare Cliff, the New Austrian Tunnelling method (NATM) was first applied in the chalk marl here. On the English side, the land tunnels were driven from Shakespeare Cliff—the same place as the marine tunnels—not from Folkestone. The platform at the base of the cliff was not large enough for all of the drives and, despite environmental objections, tunnel spoil was placed behind a reinforced concrete seawall, on condition of placing the chalk in an enclosed lagoon, to avoid wide dispersal of chalk fines. Owing to limited space, the precast lining factory was on the Isle of Grain in the Thames estuary, which used Scottish granite aggregate delivered by ship from the Foster Yeoman coastal super quarry at Glensanda in Loch Linnhe on the west coast of Scotland.
Tunnel boring machines
The eleven tunnel boring machines were designed and manufactured through a joint venture between the Robbins Company of Kent, Washington, United States; Markham & Co. of Chesterfield, England; and Kawasaki Heavy Industries of Japan. The TBMs for the service tunnels and main tunnels on the UK side were designed and manufactured by James Howden & Company Ltd, Scotland.
Railway design
The loading gauge height is 5.75 m (18 ft 10 in).
There are three communication systems:
Concession radio – for the tunnel operator's personnel and vehicles within the concession area (terminals, tunnels, coastal shafts)
Track-to-train radio – secure speech and data between trains and the railway control centre
Shuttle internal radio – communication among shuttle crew, and to passengers over car radios
Power is delivered to the locomotives via an overhead line at 25 kV 50 Hz with a normal overhead clearance of 6.03 m (19 ft 9+1⁄2 in). All tunnel services run on electricity, shared equally from English and French sources. There are two substations fed at 400 kV at each terminal, but in an emergency, the tunnel's lighting (about 20,000 light fittings) and the plant can be powered solely from either England or France.
The traditional railway south of London uses a 750 V DC third rail to deliver electricity, but since the opening of High Speed 1 there is no longer any need for tunnel trains to use it. High Speed 1, the tunnel and the LGV Nord all have power provided via overhead catenary at 25 kV 50 Hz AC. The railways on "classic" lines in Belgium are also electrified by overhead wires, but at 3,000 V DC.
A cab signalling system gives information directly to train drivers on a display. There is a train protection system that stops the train if the speed exceeds that indicated on the in-cab display. TVM430, as used on LGV Nord and High Speed 1, is used in the tunnel. The TVM signalling is interconnected with the signalling on the high-speed lines on either side, allowing trains to enter and exit the tunnel system without stopping. The maximum speed is 160 km/h (99 mph).
Signalling in the tunnel is coordinated from a control centre at the Folkestone terminal. A backup facility at the Calais terminal is staffed at all times and can take over all operations in the event of a breakdown or emergency.
Operators
LeShuttle
Getlink operates the LeShuttle, a vehicle shuttle service, through the tunnel.
Car shuttle sets have two separate halves: single and double deck. Each half has two loading/unloading wagons and 12 carrier wagons. Eurotunnel's original order was for nine car shuttle sets.
Heavy goods vehicle (HGV) shuttle sets also have two halves, with each half containing one loading wagon, one unloading wagon and 14 carrier wagons. There is a club car behind the leading locomotive, where drivers must stay during the journey. Eurotunnel originally ordered six HGV shuttle sets.
Initially 38 LeShuttle locomotives were commissioned, with one at each end of a shuttle train.
Freight locomotives
Forty-six Class 92 locomotives for hauling freight trains and overnight passenger trains (the Nightstar project, which was abandoned) were commissioned, running on both overhead AC and third-rail DC power. However, RFF does not let these run on French railways, so there are plans to certify Alstom Prima II locomotives for use in the tunnel.
International passenger
Thirty-one Eurostar trains, based on the French TGV, built to UK loading gauge with many modifications for safety within the tunnel, were commissioned, with ownership split between British Rail, French national railways (SNCF) and Belgian national railways (NMBS/SNCB). British Rail ordered seven more for services north of London. Around 2010, Eurostar ordered ten trains from Siemens based on its Velaro product. The Class 374 entered service in 2016 and has been operating through the Channel Tunnel ever since alongside the current Class 373.
Germany (DB) tried from about 2005 to get permission to run train services to London. At the end of 2009, extensive fire-proofing requirements were dropped and DB received permission to run German Intercity-Express (ICE) test trains through the tunnel. In June 2013 DB was granted access to the tunnel, but these plans were ultimately terminated.
In October 2021, Renfe, the Spanish state railway company, expressed interest in operating a cross-Channel route between Paris and London using some of their existing trains with the intention of competing with Eurostar. No details have been revealed as to which trains would be used.
Between October and November 2023, three more companies expressed interest in potentially running services between London and various European cities:
"Evolyn", a start-up company based in Spain announced plans that they intended to run services between London and Paris by 2026. The company stated that orders had been placed for the newly developed "Avelia" high speed trains built by Alstom for international operations. Alstom however, noted that no firm order for any rolling stock had been placed, but that there were ongoing discussions with the start-up over potential procurements.
Virgin Group founder Richard Branson had reportedly hired the former managing director of Virgin Trains to initiate infrastructure talks on a potential international service between London, Paris, Brussels and Amsterdam.
Dutch start-up "Heuro" announced plans to start running services from Amsterdam to both Paris and London. Heuro was said to have applied for timetable slots beginning in December 2027 and was reportedly raising investment funds in Europe and the USA.
Service locomotives
Diesel locomotives for rescue and shunting work are Eurotunnel Class 0001 and Eurotunnel Class 0031.
Operation
Usage and services
Transport services offered by the tunnel are as follows:
LeShuttle roll-on roll-off shuttle service for road vehicles and their drivers and passengers;
Eurostar passenger trains;
Through-running freight trains.
Both the freight and passenger traffic forecasts made before the construction of the tunnel were overestimated; in particular, Eurotunnel's commissioned forecasts were over-predictions. Although the captured share of Channel crossings was forecast correctly, high competition (especially from budget airlines which expanded rapidly in the 1990s and 2000s) and reduced tariffs led to low revenue. Overall cross-Channel traffic was overestimated.
With the European Union's liberalisation of international rail services, the tunnel and High Speed 1 have been open to competition since 2010. There have been a number of operators interested in running trains through the tunnel and along High Speed 1 to London. In June 2013, after several years, Deutsche Bahn obtained a licence to operate Frankfurt – London trains, not expected to run before 2016 because of delivery delays of the custom-made trains. Plans for the service to Frankfurt seem to have been shelved in 2018. In 2025, the UK Office of Rail and Road announced it had found Eurostar's maintenance facilities in London were capable of hosting a second competitor, and awarded in-Tunnel operating permission to Virgin Trains Europe, with services set to begin within the next five years.
Cross-tunnel passenger traffic volumes peaked at 18.4 million in 1998, decreased to 14.9 million in 2003, and have increased substantially since then.
At the time of the decision on building the tunnel, 15.9 million passengers were predicted for Eurostar trains during the first year. In 1995, the first full year, actual numbers were a little over 2.9 million, growing to 7.1 million in 2000, then decreasing to 6.3 million in 2003. Eurostar was initially limited by the lack of a high-speed connection on the British side. After the completion of High Speed 1 in two stages in 2003 and 2007, traffic increased. In 2008, Eurostar carried 9,113,371 passengers, a 10% increase over the previous year, despite traffic limitations due to the 2008 fire. Eurostar passenger numbers continued to increase, but experienced a sharp decline in 2020 during the COVID-19 pandemic.
Terminals
The terminals' sites are at Cheriton (near Folkestone in the United Kingdom) and Coquelles (near Calais in France). The UK site uses the M20 motorway for access. The terminals are organised with the frontier controls juxtaposed with the entry to the system to allow travellers to go onto the motorway at the destination country immediately after leaving the shuttle.
To achieve design output at the French terminal, the shuttles accept cars on double-deck wagons; for flexibility, ramps were placed inside the shuttles to provide access to the top decks. At Folkestone there are 20 kilometres (12 mi) of the main-line track, 45 turnouts and eight platforms. At Calais there are 30 kilometres (19 mi) of track and 44 turnouts. At the terminals, the shuttle trains traverse a figure eight to reduce uneven wear on the wheels. There is a freight marshalling yard west of Cheriton at Dollands Moor Freight Yard.
Regional effect
A 1996 report from the European Commission predicted that Kent and Nord-Pas de Calais would have increased traffic volumes due to the general growth of cross-Channel traffic and traffic attracted by the tunnel. In Kent, a high-speed rail line to London would transfer traffic from road to rail. Kent's regional development would benefit from the tunnel, but with it being so close to London, its benefits would be restricted. Traditional industries would see some gains and would be largely dependent on the development of Ashford International railway station. Without the station, Kent would be totally dependent on London's expansion. Nord-Pas-de-Calais, however, would enjoy a strong internal symbolic effect from the Tunnel, which would result in significant gains in manufacturing.
While eliminating a bottleneck, such as with a tunnel, does not guarantee economic benefits for all nearby areas, the perception of a region being connected to a European high-speed transport network coupled with a proactive political response is more crucial for regional economic development. Some small-medium enterprises located in the immediate vicinity of the terminal have used the opportunity to re-brand the profile of their business with positive effects, such as The New Inn at Etchinghill which were able to commercially exploit its unique selling point as being 'the closest pub to the Channel Tunnel'. Tunnel-induced regional development is small compared to general economic growth. The South East of England likely benefited developmentally and socially from faster and cheaper transport to continental Europe, but the benefits were unlikely to be distributed equally throughout the region. The overall environmental effect was almost certainly negative.
Since the opening of the tunnel, small positive effects on the wider economy have been felt, but it is difficult to identify major economic successes attributed directly to the tunnel. The Eurotunnel operates at a profit, providing a weather-proof alternative for transportation. High costs of construction did delay profitability, with companies involved in the tunnel's construction relying on government assistance to deal with the accumulated debt.
In social terms, the tunnel was predicted to increase British cohesion with the continent, and it was also viewed as a symbolic "end" of Britain as an insular island. A report in 1998 stated that two-thirds of Britons "feel European", but that, at the same time, most are hostile to the EU as a political institution.
Illegal immigration
Illegal immigrants and would-be asylum seekers have used the tunnel to attempt to enter Britain. By 1997, the problem had attracted international press attention, and by 1999, the French Red Cross opened the first migrant centre at Sangatte, using a warehouse once used for tunnel construction; by 2002, it housed up to 1,500 people at a time, most of them trying to get to the UK. In 2001, most came from Afghanistan, Iraq, and Iran, but African countries were also represented.
Eurotunnel, the company that operates the crossing, said that more than 37,000 migrants were intercepted between January and July 2015. Approximately 3,000 migrants, mainly from Ethiopia, Eritrea, Sudan and Afghanistan, were living in the temporary camps erected in Calais at the time of an official count in July 2015. An estimated 3,000 to 5,000 migrants were waiting in Calais for a chance to get to England.
Britain and France operate a system of juxtaposed controls on immigration and customs, where investigations happen before travel. France is part of the Schengen immigration zone, removing border checks in normal times between most EU member states; Britain and Ireland form their own separate Common Travel Area immigration zone.
Most illegal immigrants and would-be asylum seekers who got into Britain found some way to ride a freight train. Trucks are loaded onto freight trains. In a few instances, migrants stowed away in a liquid chocolate tanker and managed to survive, spread across several attempts. Although the facilities were fenced, total security was deemed impossible; migrants would even jump from bridges onto moving trains. In several incidents people were injured during the crossing; others tampered with railway equipment, causing delays and requiring repairs. Eurotunnel said it was losing £5m per month because of the problem.
In 2001 and 2002, several riots broke out at Sangatte, and groups of migrants (as many as 550 in a December 2001 incident) stormed the fences and attempted to enter en masse.
Other migrants seeking permanent UK settlement use the Eurostar passenger train. They may purport to be visitors (whether to be issued with a required visit visa, or deny and falsify their true intentions to obtain a maximum of 6-months-in-a-year at-port stamp); purport to be someone else whose documents they hold, or used forged or counterfeit passports. Such breaches result in refusal of permission to enter the UK, effected by Border Force after such a person's identity is fully established, assuming they persist in their application to enter the UK.
Diplomatic efforts
Local authorities in both France and the UK called for the closure of the Sangatte migrant camp, and Eurotunnel twice sought an injunction against it. As of 2006 the United Kingdom blamed France for allowing Sangatte to open, and France blamed both the UK for its then lax asylum rules/law, and the EU for not having a uniform immigration policy. The problem's cause célèbre nature even resulted in journalists being detained as they followed migrants onto railway property.
In 2002, the European Commission told France that it was in breach of European Union rules on the free transfer of goods because of the delays and closures as a result of its poor security. The French government built a double fence, at a cost of £5 million, reducing the numbers of migrants detected each week reaching Britain on goods trains from 250 to almost none. Other measures included CCTV cameras and increased police patrols. At the end of 2002, the Sangatte centre was closed after the UK agreed to absorb some migrants.
On 23 and 30 June 2015, striking workers associated with MyFerryLink damaged sections of track by burning car tyres, cancelling all trains and creating a backlog of vehicles. Hundreds seeking to reach Britain attempted to stow away inside and underneath transport trucks destined for the UK. Extra security measures included a £2 million upgrade of detection technology, £1 million extra for dog searches, and £12 million (over three years) towards a joint fund with France for security surrounding the Port of Calais.
Illegal attempts to cross and deaths
In 2002, a dozen migrants died in crossing attempts. In the two months from June to July 2015, ten migrants died near the French tunnel terminal, during a period when 1,500 attempts to evade security precautions were being made each day.
On 6 July 2015, a migrant died while attempting to climb onto a freight train while trying to reach Britain from the French side of the Channel. The previous month an Eritrean man was killed under similar circumstances.
During the night of 28 July 2015, one person, aged 25–30, was found dead after a night in which 1,500–2,000 migrants had attempted to enter the Eurotunnel terminal. The body of a Sudanese migrant was subsequently found inside the tunnel. On 4 August 2015, another Sudanese migrant walked nearly the entire length of one of the tunnels. He was arrested close to the British side, after having walked about 30 miles (48 km) through the tunnel.
Mechanical incidents
Fires
On 9 December 1994, during an "invitation only" testing phase, a fire broke out in a Ford Escort car while its owner was loading it onto the upper deck of a tourist shuttle. The fire started at about 10:00, with the shuttle train stationary in the Folkestone terminal, and was put out about 40 minutes later with no passenger injuries.
On 18 November 1996, a fire broke out on an HGV shuttle wagon in the tunnel, but nobody was hurt seriously. The exact cause is unknown, although it was neither a Eurotunnel equipment nor rolling stock problem; it may have been due to arson of a heavy goods vehicle. It is estimated that the heart of the fire reached 1,000 °C (1,800 °F), with the tunnel severely damaged over 46 m (151 ft), with some 500 m (1,640 ft) affected to some extent. Full operation recommenced six months after the fire.
On 21 August 2006, the tunnel was closed for several hours when a truck on an HGV shuttle train caught fire.
On 11 September 2008, a fire occurred in the Channel Tunnel at 13:57 GMT. The incident started on an HGV shuttle train travelling towards France. The event occurred 11 kilometres (6.8 mi) from the French entrance to the tunnel. No one was killed but several people were taken to hospitals suffering from smoke inhalation, and minor cuts and bruises. The tunnel was closed to all traffic, with the undamaged South Tunnel reopening for limited services two days later. Full service resumed on 9 February 2009 after repairs costing €60 million.
On 29 November 2012, the tunnel was closed for several hours after a truck on an HGV shuttle caught fire.
On 17 January 2015, both tunnels were closed after a lorry fire that filled the midsection of Running Tunnel North with smoke. Eurostar cancelled all services. The shuttle train had been heading from Folkestone to Coquelles and stopped adjacent to cross-passage CP 4418 just before 12:30 UTC. 38 passengers and four members of Eurotunnel staff were evacuated into the service tunnel and transported to France in special STTS road vehicles. They were taken to the Eurotunnel Fire/Emergency Management Centre close to the French portal.
Train failures
On the night of 19/20 February 1996, about 1,000 passengers became trapped in the Channel Tunnel when Eurostar trains from London broke down owing to failures of electronic circuits caused by snow and ice being deposited and then melting on the circuit boards.
On 3 August 2007, an electrical failure lasting six hours caused passengers to be trapped in the tunnel on a shuttle.
On the evening of 18 December 2009, during the December 2009 European snowfall, five London-bound Eurostar trains failed inside the tunnel, trapping 2,000 passengers for approximately 16 hours, during the coldest temperatures in eight years. A Eurotunnel spokesperson explained that snow had evaded the train's winterisation shields, and the transition from cold air outside to the tunnel's warm atmosphere had melted the snow, resulting in electrical failures. One train was turned back before reaching the tunnel; two trains were hauled out of the tunnel by Eurotunnel Class 0001 diesel locomotives. The blocking of the tunnel led to the implementation of Operation Stack, the transformation of the M20 motorway into a linear car park.
The occasion was the first time that a Eurostar train was evacuated inside the tunnel; the failing of four at once was described as "unprecedented". The Channel Tunnel reopened the following morning. Nirj Deva, Member of the European Parliament for South East England, had called for Eurostar chief executive Richard Brown to resign over the incidents. An independent report by Christopher Garnett (former CEO of Great North Eastern Railway) and Claude Gressier (a French transport expert) on the 18/19 December 2009 incidents was issued in February 2010, making 21 recommendations.
On 7 January 2010, a Brussels–London Eurostar broke down in the tunnel. The train had 236 passengers on board and was towed to Ashford; other trains that had not yet reached the tunnel were turned back.
Safety
The Channel Tunnel Safety Authority is responsible for some aspects of safety regulation in the tunnel; it reports to the Intergovernmental Commission (IGC).
The service tunnel is used for access to technical equipment in cross-passages and equipment rooms, to provide fresh-air ventilation and for emergency evacuation. The Service Tunnel Transport System (STTS) allows fast access to all areas of the tunnel. The service vehicles are rubber-tired with a buried wire guidance system.
The 24 STTS vehicles are used mainly for maintenance but also for firefighting and emergencies. "Pods" with different purposes, up to a payload of 2.5–5 tonnes (2.8–5.5 tons), are inserted into the side of the vehicles. The vehicles cannot turn around within the tunnel and are driven from either end. The maximum speed is 80 km/h (50 mph) when the steering is locked. A fleet of 15 Light Service Tunnel Vehicles (LADOGS) was introduced to supplement the STTSs. The LADOGS has a short wheelbase with a 3.4 m (11 ft) turning circle, allowing two-point turns within the service tunnel. Steering cannot be locked like the STTS vehicles, and maximum speed is 50 km/h (31 mph). Pods up to 1 tonne (1.1 tons) can be loaded onto the rear of the vehicles. Drivers in the tunnel sit on the right, and the vehicles drive on the left. Owing to the risk of French personnel driving on their native right side of the road, sensors in the vehicles alert the driver if the vehicle strays to the right side.
The three tunnels contain 6,000 tonnes (6,600 tons) of air that needs to be conditioned for comfort and safety. Air is supplied from ventilation buildings at Shakespeare Cliff and Sangatte, with each building capable of providing 100% standby capacity. Supplementary ventilation also exists on either side of the tunnel. In the event of a fire, ventilation is used to keep smoke out of the service tunnel and move smoke in one direction in the main tunnel to give passengers clean air. The tunnel was the first main-line railway tunnel to have special cooling equipment. Heat is generated from traction equipment and drag. The design limit was set at 30 °C (86 °F), using a mechanical cooling system with refrigeration plants on both sides that run chilled water circulating in pipes within the tunnel.
Trains travelling at high speed create piston effect pressure changes that can affect passenger comfort, ventilation systems, tunnel doors, fans and the structure of the trains, and which drag on the trains. Piston relief ducts of 2 m (6 ft 7 in) diameter were chosen to solve the problem, with 4 ducts per kilometre to give close to optimum results. However, this design led to extreme lateral forces on the trains, so a reduction in train speed was required and restrictors were installed in the ducts.
Unusual traffic
Trains
In 1999, the Kosovo Train for Life passed through the tunnel en route to Pristina, in Kosovo.
Other
In 2009, former F1 racing champion John Surtees drove a Ginetta G50 EV electric sports car prototype from England to France, using the service tunnel, as part of a charity event. He was required to keep to the 50 km/h (30 mph) speed limit. To celebrate the 2014 Tour de France's transfer from its opening stages in Britain to France in July of that year, Chris Froome of Team Sky rode a bicycle through the service tunnel, becoming the first solo rider to do so. The crossing took under an hour, reaching speeds of 65 km/h (40 mph)—faster than most cross-channel ferries.
Mobile network coverage
Since 2012, French operators Bouygues Telecom, Orange and SFR have covered Running Tunnel South, the tunnel bore normally used for travel from France to Britain.
In January 2014, UK operators EE and Vodafone signed ten-year contracts with Eurotunnel for Running Tunnel North. The agreements will enable both operators' subscribers to use 2G and 3G services. Both EE and Vodafone planned to offer LTE services on the route; EE said it expected to cover the route with LTE connectivity by the summer of 2014. EE and Vodafone will offer Channel Tunnel network coverage for travellers from the UK to France. Eurotunnel said it also held talks with Three UK but had yet to reach an agreement with the operator.
In May 2014, Eurotunnel announced that they had installed equipment from Alcatel-Lucent to cover Running Tunnel North and simultaneously to provide mobile service (GSM 900/1800 MHz and UMTS 2100 MHz) by EE, O2 and Vodafone. The service of EE and Vodafone commenced on the same date as the announcement. O2 service was expected to be available soon afterwards.
In November 2014, EE announced that it had previously switched on LTE earlier in September 2014. O2 turned on 2G, 3G and 4G services in November 2014, whilst Vodafone's 4G was due to go live later.
Other (non-transport) services
The tunnel also houses the 1,000 MW ElecLink interconnector to transfer power between the British and French electricity networks. During the night of 31 August/1 September 2021, the 51 km-long (32-mile) 320 kV DC cable was switched into service for the first time.